Most of the pressure in a bathroom renovation comes from decisions made late. A tile format changes the floor fall and the waste position. A stone top changes the cabinet carcass. A frameless screen changes where the wall has to be dead straight. If those choices land after the walls are open, the trades wait and the job stretches.
So our process front-loads the thinking. We measure and document the room, agree the layout, then work through the materials schedule — tiles, stone, tapware, joinery, glass, lighting — until the selections are settled enough to order and to build to. Only then do we book the strip-out.
The stages below describe how a typical Brighton bathroom runs from first conversation to handover. Every home is different, so the sequence stays the same while the detail changes. If you want the planning side in more depth, start with bathroom design and planning.
At handover the things worth checking are the quiet ones: grout lines that hold a straight run across the room, cuts that finish full at the visible corners, a floor that empties to the waste with no standing water, silicone that is cut in cleanly at every change of plane, and doors, drawers and screens that sit level and close without touching.
The image above is a reference photograph used to show a style of finish, not a photograph of our own work. Design references and how we use them are explained on the projects page.
Tell us about the room and we will work through the sequence with you from the first measure. The enquiry form asks for your name, email, phone, suburb, renovation type, budget range, timeframe and project details — the more you write in that last field, the more useful the first conversation is.