A bathroom programme is not one job — it is eight or nine trades queued behind each other, and every selection you delay pushes the whole queue to the right.
what sets the duration
Homeowners usually ask how many weeks a bathroom takes. The more useful question is which decisions are still open. Demolition and rough-in move quickly. What stalls a Brighton bathroom is a tile that is out of stock, a stone slab that has to be templated after the joinery is installed, or a tapware finish changed after the wall is sheeted and the plumber has already set the outlets.
Because of that, we ask clients to lock selections during bathroom design and planning rather than mid-build. Once the schedule is fixed, the trade sequence can be booked back to back, and the site is only open for as long as the work genuinely requires. Anyone offering a firm date before the selections are closed is guessing.
REV A — SEQUENCE
Each stage has to finish before the next can start. Nothing here can be run in parallel to save time — that is what makes the sequence, not the calendar, the real constraint.
Fixtures, linings and old screed come out. This is the stage where hidden conditions surface in older bayside homes: previous leaks, patched substrates, or framing that has moved. Findings here can adjust everything that follows, so we report them before proceeding.
Plumbing and electrical are set out to the approved plan, niches and screed falls are framed, and any structural changes are completed. Wall-hung basins, concealed cisterns and walk-in shower set-outs are decided here — they cannot be moved later without opening the wall again.
Membrane is applied in coats, and each coat has to cure for the period the manufacturer specifies before the next is applied or before tiling begins. This wait is not padding in the programme and it should never be shortened. See bathroom waterproofing for how the stage is documented.
Large-format porcelain, mosaic and natural stone all take different amounts of setting-out time, and adhesive and grout need their own curing before the room is walked on. Format and joint width directly affect this stage — the detail is covered in bathroom tiling.
Custom vanities and cabinetry are installed, stone tops are templated to the finished cabinet, and frameless screens are measured to the tiled opening. Templating and fabrication happen off site, so this stage carries a lead time even when the room itself is ready.
WHAT STRETCHES A PROGRAMME
WHAT KEEPS IT TIGHT
living through it
If the house has a second bathroom, most families stay put. If it does not, plan for the period between strip-out and fit-off when the room is unusable — that window is unavoidable, not a scheduling failure.
Older Brighton homes add their own variables: narrow rear access, shared driveways, tight stair runs for slab and screen delivery, and neighbours close on both sides. We set working hours, dust protection and delivery access at the start so the disruption is contained rather than negotiated daily. See bathroom renovations for the full scope of works.
Some of it — ordering earlier, closing selections sooner and keeping the layout where it is all remove waiting time. Curing and fabrication cannot be compressed, and attempting it is where waterproofing and tiling failures start.
Usually yes, particularly on a suspended timber floor or where a slab is involved. It also affects floor falls and the shower set-out, which is why layout changes belong in the design stage rather than on site.
Before demolition. Confirm the actual batch is available, not just the range. A single out-of-stock item can hold a whole room, and dye lots vary between batches on both tile and stone.
Often, because there is less floor area and fewer fixtures — but the same stage sequence and the same curing periods still apply. Smaller rooms also demand more precise setting-out, which takes its own time.
Send us the room, the scope you have in mind and when you would like the work to start. We will talk honestly about sequencing, lead times and what needs deciding first.