01 — Demolition and make-good. Stripping back, removing waste and repairing what is found. Modest on its own, unpredictable in older homes.
02 — Rough-in. Plumbing and electrical set to the new plan. Every fixture you relocate is paid for here, which is why layout decisions belong at the drawing stage.
03 — Waterproofing and screed. Falls formed to the waste, membrane applied and cured. Time-bound work that cannot be compressed.
04 — Tiling. Usually the longest trade on site and the one most affected by your selections, from setting out to grout colour.
06 — Fit-off. Tapware, mirrors, lighting and final adjustments. Small items, visible finish, and the easiest place for a budget to drift upward.